Water Pretreatment Unit
   Capacity : Max Flow Rate 5.578 m³ / h Normal Flow Rate 4.800 m³ / h
   Engineering and Supply Contractor : Lurgi – GERMANY; Enka - TURKEY ( Line 1 )
   Construction Contractor : Alke - TURKEY ( Line 1 ) Afken – TURKEY ( Line 2 )
   Start Up Date : 01.01.1983
   Expansion Date : 2005
   End Uses : Fire Water, Raw Water, Process Water, Cooling Water & Drinking Water
   Total Storage Capacity of Raw Water Basins : 80.000 m³