MAJOR INVESTMENT PROJECTS (1) Last Updated : 08.01.2008
INVESTMENT PROJECT PROJECT COST MILLION $ CAPACITY INCREASE (TONS/YEAR) BEGINNING - COMPLETION DATE L : Licensor
BE: Basic Engineering
DE : Detailed Engineering
P : Procurement
SC : Site Contractor
CHLORINE-ALKALI PLANT (CONVERSION TO MEMBRANE CELL TECHNOLOGY) 35.1 20,000 CHLORINE
(FROM 80,000 TO 100,000)
22,000 CAUSTIC
(FROM 90,000 TO 112,000)
400 000 TO BRINE
1998-2002 CEC - JAPAN (L,BE,DE,)
CEC + PETKİM (P)
PAKPAŞ İNŞ-TÜRKİYE (SC)
MESSO-CHEMIE TECHNIK (BE,DE,P)
ALKE İNŞAAT-TÜRKİYE (SC)
ADDITION OF AN OXY-CHLORINATION LINE TO VCM PLAN 13.8 15,000 EDC
(MODERNIZATION OF THE WHOLE UNIT)
1997-2000 VINNOLIT - GERMANY (L)
KRUPP UHDE-GERMANY (BE,DE,P)
ÇİLTUĞ A.Ş - TÜRKİYE (SC)
ADDITION OF A SECOND 20 MW CONDENSING TYPE TURBO GENERATOR TO THE POWER PLANT/ ADDITION OF COOLING TOWER 12.1 56 MW
(FROM 95 MW TO 151 MW)
1997-2001 ABB - SWEDEN (BE,DE,P)
SETA İNŞ - TÜRKİYE (SC)
SPIG - ITALY (BE,DE,P)
EREN İNŞ- TÜRKİYE (SC)
 
MAJOR INVESTMENT PROJECTS (2)  
INVESTMENT PROJECT PROJECT COST MILLION $ CAPACITY INCREASE (TONS/YEAR) BEGINNING - COMPLETION DATE L : Licensor
BE: Basic Engineering
DE : Detailed Engineering
P : Procurement
SC : Site Contractor
ADDITION OF 17th REACTOR TO THE 4th PRODUCTION LINE OF PVC PLANT 0.8 10,000
(FROM 140,000 TO 150,000)
1998-2001 SOLVAY - BELÇİKA (L)
PETKİM - (TM, DM, T)
TERBAY A.Ş- TÜRKİYE (İM)
2nd EXPANSION OF HDPE PLANT 18.5 30,000
(FROM 66,000 TO 96,000)
1998-2001 MITSUI CHEM- JAPAN (L,BE)
LURGI - GERMANY (DE,P)
ÇOLAKOĞLU İNŞ-TÜRKİYE (SC)
ADDITION OF A NEW LIQUID-SOLID WASTE TREATMENT UNIT AND MODERNIZATION OF THE EXISTING UNIT 20.2 INCINERATION OF
17,500 T/Y WASTE,
11.5 TONS/ HOUR
STEAM GENERATION
1999-2002 VINCI (SGEE) - FRANCE (BE,DE,P)
SİSTEM YAPI-TÜRKİYE (SC)
VCM PLANT REHABILITATION AND HCL PRODUCTION 19.8 10,000
(FROM 142,000 TO 152,000)
1999-2003 VINNOLIT - GERMANY (L)
KRUPP UHDE - GERMANY (BE, DE, P)
PASİNER-TÜRKİYE(SC)
 
MAJOR INVESTMENT PROJECTS (3)  
INVESTMENT PROJECT PROJECT COST MILLION $ CAPACITY INCREASE (TONS/YEAR) BEGINNING - COMPLETION DATE L : Licensor
BE: Basic Engineering
DE : Detailed Engineering
P : Procurement
SC : Site Contractor
EXPANSION OF THE WATER PRE-TREATMENT UNIT 7.9 3,000 M3/HR
(FROM 4,500 M3/HR TO 7,500 M3/HR)
1999-2004 OTV - FRANCE /HIDRO OTV - TÜRKİYE (BE,DE,P)
AKFEN-TÜRKİYE (SC)
EXPANSION OF ETHYLENE PLANT 98.3 120,000
(FROM 400,000 TO 520,000)
1999-2005 S&W – U.KINGDOM (L, BE)
IFP (FRANCE (L,BE)(C3-C4 H.)
MITSUI ENG.-JAPAN+GAMA-TR(LUMP SUM TURNKEY)
ADDITION OF 3rd PRODUCTION LINE TO LDPE PLANT 76.6 120,000
(FROM 190,000 TO 310,000)
1999-2005 DSM - STAMICARBON - HOLLAND (L, BE)
TECHNIP - FRANCE (DE, P)
TOKAR-TÜRKİYE (SC)
2nd EXPANSION OF PP PLANT 30.0 64,000
(FROM 80,000 TO 144,000)
1999-2005 MITSUI CHEM-JAPAN (L,BE)
MITSUI ENG.(MES)- JAPAN (DE,P)
EMTA-TÜRKİYE (SC)
 
MAJOR INVESTMENT PROJECTS (4)  
INVESTMENT PROJECT PROJECT COST MILLION $ CAPACITY INCREASE (TONS/YEAR) BEGINNING - COMPLETION DATE L : Licensor
BE: Basic Engineering
DE : Detailed Engineering
P : Procurement
SC : Site Contractor
REHABILITATION OF COOLING WATER SYSTEM 11.4 CAPACITY INCREASE OF THE EXISTING COOLING WATER SYSTEM 2001-2005 SALINE WATER SPEC.-ITALY(DE,P)
ALKE+MARSİS-TÜRKİYE (SC)
REHABILITATION OF DEMINERALIZED WATER SYSTEM 4.8 CAPACITY INCREASE OF THE EXISTING DEMINERALIZED WATER SYSTEM 2001-2005 OTV-France (BE,DE,P)
MARSİS-TÜRKİYE (SC)
DEBOTTLENECKING OF STEAM GENERATION UNIT 88.0 MODIFICATION OF EXISTING BOILERS FOR UTILIZATION OF NAT. GAS IN ADDITION TO FUEL-OIL, 50 MW GAS TURBINE GENERATOR AND HEAT RECOVERY. 2001-2008 ANSALDO-CALDAIE-ITALY+TOKAR-TÜRKİYE(LUMP SUM TURNKEY)
CHLORINE ALKALI PLANT 9.4 RENEWAL OF ANODES, CATHODES, MEMBRANES AND ADDITION OF 1 CELL 2005-2008 CEC - JAPAN (L,BE,DE,P)


TOTAL

 


446.7